Contact us

The high standards and great location of Colmore Plaza has attracted a number of blue chip occupiers to the distinctive building.

An advanced Delmatic dimming system controls lighting throughout the project and has allowed tenants to customise the integrated services in their area.

Colmore Plaza

High specification building in the heart of Birmingham's commercial district

PROJECT INFORMATION

locationBirmingham, UK
size30,000 sq.m
architectAedas Architects
consultantDerry Building Services (D&B)
contractorBowmer & Kirkland

SCOPE OF WORKS

LON
Central Battery Integration
Scene Setting
Project Mangament
Power Over Ethernet
Lifetime Support

One of the fastest development schedules in Birmingham history

The 30,000 sq.m office building was designed, procured and constructed in just over 24 months – one of the fastest development schedules in recent city history.

High specification, high efficiency

The high-specification Delmatic dimming system provides energy-efficient presence detector and daylight-linked control of lighting throughout the tenanted office spaces with full graphical management and monitoring of the lighting installation from a network PC. For speed of installation the system provides full plug-in connectivity with incoming lighting supply, the switched and dimmed outputs to the luminaires, as well as the presence detectors and multisensors all connecting to powerful Plug-in modules.

A fully customisable solution

The modular system architecture allows individual tenants to customise the system operation within their domain as well as to “plug-in” enhanced features such as web-browser switching and dimming, IP phone and App control, and integrated scene-setting with comprehensive AV integration.